Northfield Grid Operations
Energy- Challenge
- Substation telemetry was signed in software on 40,000 field controllers. Key rotation took eleven weeks per cycle and a regulator deadline was fifteen months out.
- Approach
- Dropped the KLV-7000 onto the existing controller board and moved signing and key storage into hardware. No firmware rewrite — the SDK kept the same call signature.
Read the full study“We budgeted a year for the migration and finished the first region in six weeks. The part that surprised us was that nothing else had to change.”